Lunar New Year
7/2/2073
Leap month
None
Days
354 days
Year element
Long-Flowing Water
What's special about 2073
2073 is the year of Water Snake — the year of the Snake (Si branch), Na Yin Long-Flowing Water, of the Water element. Lunar New Year falls on Tuesday 7/2/2073, 12 days earlier than in 2072 (19/2/2072).
- The lunar year has 354 days: 6 long months (30 days) and 6 short months (29 days).
- The year has 12 months, with no leap month.
- This lunar year has no Start of Spring — both the 2073 and 2074 Start of Spring fall outside the span from Lunar New Year 2073 to Lunar New Year 2074; folk tradition calls it a "springless" year.
- The solar year 2073 is not a leap year: February has 28 days.
- The Water Snake year ends on New Year's Eve, before Lunar New Year 2074 (27/1/2074).
Lunar holidays
| Festivals | Lunar | Solar (Gregorian) |
|---|---|---|
| Lunar New Year | 1/1 | 7/2/2073 |
24 solar terms of 2073
| Solar terms | Start date |
|---|---|
| Minor Cold | 5/1/2073 |
| Major Cold | 19/1/2073 |
| Start of Spring | 3/2/2073 |
| Rain Water | 18/2/2073 |
| Awakening of Insects | 5/3/2073 |
| Spring Equinox | 20/3/2073 |
| Thanh minh | 4/4/2073 |
| Grain Rain | 19/4/2073 |
| Start of Summer | 5/5/2073 |
| Grain Buds | 20/5/2073 |
| Grain in Ear | 5/6/2073 |
| Summer Solstice | 21/6/2073 |
| Minor Heat | 6/7/2073 |
| Major Heat | 22/7/2073 |
| Start of Autumn | 7/8/2073 |
| End of Heat | 22/8/2073 |
| White Dew | 7/9/2073 |
| Autumn Equinox | 22/9/2073 |
| Cold Dew | 7/10/2073 |
| Frost's Descent | 23/10/2073 |
| Start of Winter | 7/11/2073 |
| Minor Snow | 22/11/2073 |
| Major Snow | 6/12/2073 |
| Winter Solstice | 21/12/2073 |


