Lunar New Year
15/2/2094
Leap month
None
Days
355 days
Year element
Great Stream Water
What's special about 2094
2094 is the year of Wood Tiger — the year of the Tiger (Yin branch), Na Yin Great Stream Water, of the Water element. Lunar New Year falls on Monday 15/2/2094, 19 days later than in 2093 (27/1/2093).
- The lunar year has 355 days: 7 long months (30 days) and 5 short months (29 days).
- The year has 12 months, with no leap month.
- The Start of Spring of this lunar year falls on 3/2/2095.
- The solar year 2094 is not a leap year: February has 28 days.
- The Wood Tiger year ends on New Year's Eve, before Lunar New Year 2095 (5/2/2095).
Lunar holidays
| Festivals | Lunar | Solar (Gregorian) |
|---|---|---|
| Lunar New Year | 1/1 | 15/2/2094 |
24 solar terms of 2094
| Solar terms | Start date |
|---|---|
| Minor Cold | 5/1/2094 |
| Major Cold | 19/1/2094 |
| Start of Spring | 3/2/2094 |
| Rain Water | 18/2/2094 |
| Awakening of Insects | 5/3/2094 |
| Spring Equinox | 20/3/2094 |
| Thanh minh | 4/4/2094 |
| Grain Rain | 19/4/2094 |
| Start of Summer | 5/5/2094 |
| Grain Buds | 20/5/2094 |
| Grain in Ear | 5/6/2094 |
| Summer Solstice | 21/6/2094 |
| Minor Heat | 6/7/2094 |
| Major Heat | 22/7/2094 |
| Start of Autumn | 7/8/2094 |
| End of Heat | 22/8/2094 |
| White Dew | 7/9/2094 |
| Autumn Equinox | 22/9/2094 |
| Cold Dew | 8/10/2094 |
| Frost's Descent | 23/10/2094 |
| Start of Winter | 7/11/2094 |
| Minor Snow | 22/11/2094 |
| Major Snow | 6/12/2094 |
| Winter Solstice | 21/12/2094 |


