Lunar New Year
24/1/2107
Leap month
Leap month 4
Days
384 days
Year element
Fire in the Furnace
What's special about 2107
2107 is the year of Fire Rabbit — the year of the Rabbit (Mao branch), Na Yin Fire in the Furnace, of the Fire element. Lunar New Year falls on Monday 24/1/2107, 11 days earlier than in 2106 (4/2/2106).
- The lunar year has 384 days: 7 long months (30 days) and 6 short months (29 days).
- This is a lunar leap year (13 months): leap month 4 runs from 23/5/2107 to 20/6/2107 (solar).
- This lunar year has two Starts of Spring (first on 4/2/2107, then in early February 2108, before Lunar New Year 2108); folk tradition calls it a "double spring" year.
- The solar year 2107 is not a leap year: February has 28 days.
- The Fire Rabbit year ends on New Year's Eve, before Lunar New Year 2108 (12/2/2108).
Lunar holidays
| Festivals | Lunar | Solar (Gregorian) |
|---|---|---|
| Lunar New Year | 1/1 | 24/1/2107 |
24 solar terms of 2107
| Solar terms | Start date |
|---|---|
| Minor Cold | 6/1/2107 |
| Major Cold | 21/1/2107 |
| Start of Spring | 4/2/2107 |
| Rain Water | 19/2/2107 |
| Awakening of Insects | 6/3/2107 |
| Spring Equinox | 21/3/2107 |
| Thanh minh | 5/4/2107 |
| Grain Rain | 21/4/2107 |
| Start of Summer | 6/5/2107 |
| Grain Buds | 21/5/2107 |
| Grain in Ear | 6/6/2107 |
| Summer Solstice | 22/6/2107 |
| Minor Heat | 7/7/2107 |
| Major Heat | 23/7/2107 |
| Start of Autumn | 8/8/2107 |
| End of Heat | 24/8/2107 |
| White Dew | 8/9/2107 |
| Autumn Equinox | 23/9/2107 |
| Cold Dew | 9/10/2107 |
| Frost's Descent | 24/10/2107 |
| Start of Winter | 8/11/2107 |
| Minor Snow | 23/11/2107 |
| Major Snow | 8/12/2107 |
| Winter Solstice | 22/12/2107 |


