Lunar New Year
12/2/2184
Leap month
None
Days
354 days
Year element
Spring Water
What's special about 2184
2184 is the year of Wood Monkey — the year of the Monkey (Shen branch), Na Yin Spring Water, of the Water element. Lunar New Year falls on Thursday 12/2/2184, 19 days later than in 2183 (24/1/2183).
- The lunar year has 354 days: 6 long months (30 days) and 6 short months (29 days).
- The year has 12 months, with no leap month.
- This lunar year has no Start of Spring — both the 2184 and 2185 Start of Spring fall outside the span from Lunar New Year 2184 to Lunar New Year 2185; folk tradition calls it a "springless" year.
- The solar year 2184 is a leap year: February has 29 days.
- The Wood Monkey year ends on New Year's Eve, before Lunar New Year 2185 (31/1/2185).
Lunar holidays
| Festivals | Lunar | Solar (Gregorian) |
|---|---|---|
| Lunar New Year | 1/1 | 12/2/2184 |
24 solar terms of 2184
| Solar terms | Start date |
|---|---|
| Minor Cold | 6/1/2184 |
| Major Cold | 20/1/2184 |
| Start of Spring | 4/2/2184 |
| Rain Water | 19/2/2184 |
| Awakening of Insects | 5/3/2184 |
| Spring Equinox | 20/3/2184 |
| Thanh minh | 4/4/2184 |
| Grain Rain | 19/4/2184 |
| Start of Summer | 5/5/2184 |
| Grain Buds | 20/5/2184 |
| Grain in Ear | 5/6/2184 |
| Summer Solstice | 20/6/2184 |
| Minor Heat | 6/7/2184 |
| Major Heat | 22/7/2184 |
| Start of Autumn | 6/8/2184 |
| End of Heat | 22/8/2184 |
| White Dew | 7/9/2184 |
| Autumn Equinox | 22/9/2184 |
| Cold Dew | 7/10/2184 |
| Frost's Descent | 23/10/2184 |
| Start of Winter | 7/11/2184 |
| Minor Snow | 21/11/2184 |
| Major Snow | 6/12/2184 |
| Winter Solstice | 21/12/2184 |


